Skip to main content
SpeakEasy KCMO Home

Connect Trolley Trail to Neighborhoods

From "Bikeways and Trail Plan"

Go to the project

The current trail along 85 to 75 has a lack of access from residents to the trail. Increasing sidewalk coverage will increase pedestrian access to the trailway.

Comments(1)

Commenting is not possible because this project is currently not active.
Most recent comments have loaded.
You are right. Many of the east/west streets do not have sidewalks in the south trolley trail area. From personal experience, it is scary during rush hour walking from the Trolley Trail back to Oak St with a 5 year old.
  • 1 like

Share

Posted by

Current status

Submitted